40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log  Not logged in ELOG logo
Entry  Mon Sep 19 02:33:34 2011, kiwamu, HowTo, General, Plan for this week 
    Reply  Mon Sep 19 11:49:32 2011, Jenne, HowTo, General, Plan for this week: SUS inversion 
    Reply  Mon Sep 19 14:57:36 2011, kiwamu, Summary, IOO, IP POS is back wiring.png
Message ID: 5459     Entry time: Mon Sep 19 14:57:36 2011     In reply to: 5455
Author: kiwamu 
Type: Summary 
Category: IOO 
Subject: IP POS is back 

IPPOS is back. A cable had been disconnected at the 1Y2 rack. So I put it back to place.

The cartoon below shows the current wiring diagram. I think this configuration is exactly the same as it it used to be.

wiring.png

Quote from #5455

  + Fixing IPPOS (volunteers) 

ELOG V3.1.3-