40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log  Not logged in ELOG logo
Message ID: 5343     Entry time: Tue Sep 6 11:27:19 2011
Author: Jenne 
Type: Update 
Category: General 
Subject: Afternoon pre-pumpdown todo list 

These are the things that I can think of that we need to do before we can close up:

* Take a close look at both ITMs' OSEMs, and ensure that the magnets aren't too close to either plate in the OSEMs.  Both have had funny business over the past week.

* Do a free swinging test on both ITMs.  (ITMY may not need it, if we haven't touched it since the last free swinging test, but it can't hurt to take the data)

* Confirm that POX is exiting the chamber.

* Is there anything else???

 

Our goal is to finish this work by tonight, so that we can close doors and start pumping tomorrow.

ELOG V3.1.3-