Quote: |
We've closed up ETMX:
- the optic was drag wiped
- the suspension tower was put back in place
- earthquake stops were backed off the appropriate number of turns, and de-ionized
- chamber door was put on
|
jamie, jenne, kiwamu, suresh, steve
ETMY and ITMY were treated the same way as ETMX. The BS chamber was closed with heavy vac door yesterday also. The IOO access connector's inner jamnuts are torqued to 45 ft/lbs as all vac door bolts.
The vac envelope is ready for pumpdown condition, except ITMX chamber with light atm door cover.
Jenne will summeries the condition of dust on the TMs before and after the drag wipes. |