We will begin drag wiping and putting on doors at 9am tomorrow (Tuesday).
We need to get started on time so that we can finish at least the 4 test masses before lunch (if possible).
We will have a ~2 hour break for LIGOX + Valera's talk.
I propose the following teams:
(Team 1: 2 people, one clean, one dirty) Open light doors, clamp EQ stops, move optic close to door. ETMX, ITMX, ITMY, ETMY
(Team 2: K&J) Drag wipe optic, and put back against rails. Follow Team 1 around.
(Team 3 = Team 1, redux: 2 people, one clean, one dirty) Put earthquake stops at correct 2mm distance. Follow Team 2 around.
(Team 4: 3 people, Steve + 2) Close doors. Follow Team 3 around.
Later, we'll do BS door and Access Connector. BS, SRM, PRM already have the EQ stops at proper distances.
|