GOAL : To lock the central part of ifo
Here is the plan:
Mon - assemble all the cables from PDs and mixers, and check the CDS channels. Prepare the beamsplitters.
Tue - The current paths to REFL11 and REFL55 will be modified to the four paths to REFL11, 33, 55, 165. And the PDs will be placed.
Wed, Thu - during waiting for the ifo available with vacuum, help aligning the POP, POX, POY. In parallel, a simulation to find the PRC length SRC
length tolerance will be proceeded.
Fri - When the ifo becomes available with vacuum, the sensing signals by 3-f scheme will be obtained with proper demodulation phases.
Sat - Try to lock the central part of the ifo with the new 3-f signals. |