40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log  Not logged in ELOG logo
Message ID: 5181     Entry time: Thu Aug 11 02:16:57 2011
Author: Jenne 
Type: Update 
Category: Green Locking 
Subject: Y-green aligned and flashing 

[Jenne, with ample supervision by Kiwamu and Suresh]

Y-green was aligned, and is now flashing.  The ETMY trans camera was very helpful for this alignment.  I didn't end up needing to use a foil aperture. 

Kiwamu and Suresh had just closed up the IOO doors, so we don't know yet where it's hitting on the PSL table (if the beam is making it that far).  Tomorrow we'll look at ITMY to see if the green beam is centered there, and if it's coming out to the PSL table.

ELOG V3.1.3-