Entry  Tue Aug 9 10:15:25 2011, kiwamu, Update, General, in-vac work plan today 
    Reply  Tue Aug 9 15:14:46 2011, Koji, Update, General, in-vac work plan today 
Message ID: 5155     Entry time: Tue Aug 9 15:14:46 2011     In reply to: 5152
Author: Koji 
Type: Update 
Category: General 
Subject: in-vac work plan today 

This morning Kiwamu and I have aligned the MC. Kiwamu aligned the last steering (on the OMC table) to recover the touch last week.
Then I have aligned the MC with MC1 and MC3 as the last steering did not help to get TEM00.

Before

C1:SUS-MC1_PIT_COMM = 2.6587
C1:SUS-MC1_YAW_COMM = 2.7471
C1:SUS-MC2_PIT_COMM = 3.486
C1:SUS-MC2_YAW_COMM = -1.1592
C1:SUS-MC3_PIT_COMM = -1.876
C1:SUS-MC3_YAW_COMM = 1.2829

After

C1:SUS-MC1_PIT_COMM = 2.7596
C1:SUS-MC1_YAW_COMM = 2.6627

C1:SUS-MC2_PIT_COMM = 3.486
C1:SUS-MC2_YAW_COMM = -1.1592
C1:SUS-MC3_PIT_COMM = -1.697
C1:SUS-MC3_YAW_COMM = 1.2901

Quote:

We will move on to the vertex region today.

The goal of the vertex region work is to get the pick-off beams out the chambers, including POX/Y and POP.

The work will be in parallel to the ETM woks.

The first step will be : lock and align MC with the IR beam.

 