Message ID: 5122     Entry time: Fri Aug 5 08:08:42 2011
Author: kiwamu 
Type: Summary 
Category: General 
Subject: plan today 

Today's main mission is : adjustment of the arm length

 

   + Open the ETMX(Y) door, starting from 9:00 AM

   + Secure the ETMX(Y) test mass by tightening the earthquake stops.

   + Move the ETMX(Y) suspension closer to the door side

   + Inspect the OSEMs and take pictures before and after touching the OSEMs.

   + Level the table

   + Adjust the OSEM positions

   + Move the ETMX(Y) suspension to have designed X(Y)arm length

   + Level the table again

   + Align the ETMX(Y) such that the green beam resonate