40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log  Not logged in ELOG logo
Message ID: 5068     Entry time: Sat Jul 30 07:07:28 2011
Author: kiwamu 
Type: Update 
Category: ASC 
Subject: MCASS status 

Since we will measure (and hopefully adjust) the spot positions on the MC suspensions prior to the vent, MCASS is necessary for it.

 

#######################

Here is the MCASS status so far:

  + Valera worked on MCASS on the last February, and basically no progress after he left.

  + The MCASS model had been completed in C1IOO.mdl.

  + He made some useful scripts, including mcassup, mcassOn/Off, senseMCdecenter, senseMCmirrro and senseMCdofs.

       Summary of those scripts can be found in his entry #4355.

  + We haven't closed the MCASS loops.

  + The control filters are still blank.

  + We haven't put any elements on the input and output matrices.

  + Some parameters for the dithering oscillators and demodulation systems were properly set.

     So we can get the demodulated signals by simply running mcassUp and mcassOn. (This essentially corresponds to the A2L measurement.)

  + The PIT motions are driven at 10, 11 and 12 Hz for MC1, 2 and 3 respectively. For YAW, the frequencies were chosen to be 11.5, 12.5 and 13.5 Hz.

  + Some medm windows were prepared but not as refined as that of ASS.

  + Valera performed a measurement of the spot positions by using MCASS. The results are summarized in #4660.

  + We made an estimation about the beam clearance on the Faraday based on the measured spot positions (#4674)

 

#########################

So, it seems we should be able to at least measure the spot positions soon by using his scripts.

ELOG V3.1.3-