Summary of the week ending July 3rd. Number of elog entries = 44
- SUS
* The output TO_COIL matrix were simplified
* Checked all the BO whitening switch => Only ITMY_UL didn't switch
* All the DOF filters were normalized.
=> All the DOF filters are now ("3:0.0", "Cheby", "BounceRoll")
=> The High pass should have 30Hz cut off ("30:0.0") ?
* All the resonant peaks has been fit
- LSC
* MICH noise budget.
=> dominated by sensing noise.
* The sensing matrix in the PRMI configuration was measured.
=> The demodulation phase on AS55 seemed wrong. Need a doublecheck
* A new screen, called C1LSC_OVERVIEW.adl, was released.
* A channel name modification: "PRC" and "SRC" => "PRCL" and "SRCL" and etc.
* The response of the LSC whitening filters were checked.
=> CH26 showed different phase response.
- MC work
* Power budget on the AP table was made (in a high power situation).
REFL11 = 7.4 mW
REFL55 = 22 mW
MCREFL = 114 mW
WFS1 = 1.24 mW
WFS2 = 2.7 mW
* Measurement and adjustment of RFQPD response
Resonance frequencies of WFS1 and WFS2 were adjusted. WFS1 and WFS2 were installed on the AP table
* Started working on MCL path.
=> needs some more CDS jobs to correctly assign ADC channels
- CDS
* Joe modified the automated scripts for producing model webviews
- ABSL
* The alignment of the injection beam was done.
- Fiber experiment
* A fiber was laid down from the ETMY table to the PSL table
- TT characterization
* The mechanical stage for the horizontal displacement measurements is set up.
- Configuration and other topics
* Maglev stuff has gone to bridge lab.
* Chris.W told us that the EPICS mutex issue can be solved by upgrading the EPICS version
* All the PDs are stored in the east arm cabinet E4
* Safety interlocks were connected to the ETMY laser and ABSL laser
* Cshrc.40m was modified to make 32-bit machine happy
* NDS2 buffer size on Mafalada had been too small and was increased somewhat such that we can still work for the SUS peak fit job
|