Entry  Thu Jun 30 03:26:40 2011, kiwamu, Update, ABSL, status update 
    Reply  Thu Jun 30 14:11:55 2011, kiwamu, Update, ABSL, a photo of ABSL setup on the AP table ABSLsetup.png
       Reply  Tue Jul 5 16:09:54 2011, kiwamu, Update, ABSL, some photos for ABSL setup APtable.pngPSLtable.png
    Reply  Thu Jun 30 21:00:20 2011, kiwamu, Update, ABSL, fine alignment done 
Message ID: 4925     Entry time: Thu Jun 30 21:00:20 2011     In reply to: 4917
Author: kiwamu 
Type: Update 
Category: ABSL 
Subject: fine alignment done 

(Just a quick report)

The fine alignment of the ABSL laser injection was successfully done.

I was able to see the DRMI fringings at the AS camera. The ABSL beam is injected from the AS port, therefore what I saw on the camera was the reflection back from the interferometer.

 

(Things to be done)

 -  A beat-note setup on the PSL table.

 - Refinement of the mode matching. The beam spot on the AS camera is a bit bigger, so I should more tightly focus the injected beam.

Quote from #4917

 - Fine alignments will be done tomorrow

ELOG V3.1.3-