40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log  Not logged in ELOG logo
Entry  Thu Jun 30 03:26:40 2011, kiwamu, Update, ABSL, status update 
    Reply  Thu Jun 30 14:11:55 2011, kiwamu, Update, ABSL, a photo of ABSL setup on the AP table ABSLsetup.png
       Reply  Tue Jul 5 16:09:54 2011, kiwamu, Update, ABSL, some photos for ABSL setup APtable.pngPSLtable.png
    Reply  Thu Jun 30 21:00:20 2011, kiwamu, Update, ABSL, fine alignment done 
Message ID: 4917     Entry time: Thu Jun 30 03:26:40 2011     Reply to this: 4923   4925
Author: kiwamu 
Type: Update 
Category: ABSL 
Subject: status update 

Status update of the absolute length (ABSL) measurement:

 - To accommodate the ABSL stuff, the AS path was relocated on the AP table.

     (In this evening Jenne was able to lock MICH with AS55, so it's working fine.)

 - On the AP table all of the necessary items, including the NPRO, a Faraday, some mirrors and etc., were in place

 - The mode matching was coarsely done. The Rayleigh range looked reasonably long.

 - Fine alignments will be done tomorrow

 - Also a picture of the setup will be uploaded in the morning.