This is a summary for the week ending June 19th. Feel free to edit this entry.
(Number of elog entries = 27)
* Refinement of LSC screen
-> Kissel buttons and some indicators were newly installed
-> A script to autonatically generate kissel buttons was made
* New BIO installed on ETMY
* LightWave for ABSL
-> taken out from the MOPA box and put on the AP table with temporary use of the Y end laser controller
* Shipping 2 RFPDs to LLO
* LEDs on the BIO for the vertex suspensions were blown
-> fixed and re-installed. A test script will be prepared
* PEM AA board was fixed
* A plot of the MICH noise was produced for the first time
* Schnupp asymmetry measurement : Las = 3.64+/-0.32cm
* The photo diode on WFS2 has been replaced by YAG-444-4A
* SUS binary IO crates were taken out
* Fiber died
->C1LSC was unable to communicate to C1SUS. Installing a new copper Dolphine fixed the issue.
* SURF students came |