40m
QIL
Cryo_Lab
CTN
SUS_Lab
TCS_Lab
OMC_Lab
CRIME_Lab
FEA
ENG_Labs
OptContFac
Mariner
WBEEShop
|
40m Log |
Not logged in |
 |
|
Wed Aug 26 16:10:28 2009, Peter King, Configuration, PSL, PSL reference cavity temperature box modifications
|
Wed Aug 26 16:35:03 2009, Alberto, Configuration, PSL, PSL reference cavity temperature box modifications
|
Sun May 8 22:59:40 2011, rana, Update, PSL, PSL reference cavity temperature box modifications
|
Mon May 9 20:30:20 2011, rana, Update, PSL, PSL reference cavity temperature box modifications
|
Tue May 10 20:57:05 2011, rana, Update, PSL, PSL reference cavity temperature box modifications : after 24 hours still OK
|
|
Message ID: 4681
Entry time: Tue May 10 20:57:05 2011
In reply to: 4672
|
Author: |
rana |
Type: |
Update |
Category: |
PSL |
Subject: |
PSL reference cavity temperature box modifications : after 24 hours still OK |
|
|
Quote: |
I re-installed the box (@ ~8:15) after reflowing some of the solder joints. I will observe it over night and then remove the 1K resistors. Attached is a 8 hour minute-trend.
|
I compared this 24 hour trend with the one from this day exactly one year ago. Seems the same, so now I can make the resistor change. |
|
|