Entry  Sun May 8 16:32:52 2011, valera, Update, IOO, MC beam spot centering 
    Reply  Sun May 8 17:29:01 2011, rana, Update, IOO, MC beam spot centering 
Message ID: 4660     Entry time: Sun May 8 16:32:52 2011     Reply to this: 4661
Author: valera 
Type: Update 
Category: IOO 
Subject: MC beam spot centering 

 Kiwamu told me that the CDS matrix notation has changed and the 40m front end code has changed since February. I changed the senseMCdecentering script to reflect that. The other problems were: the "-" sign in ezcastep on ubuntu is not recognized - I used the known workaround of using "+-" instead; the echo command in csh script on ubuntu does not make a new line - but the echo " " does. The script ran on ubuntu with one error message "FATAL: exception not rethrown" but it finished nevertheless. The data appeared ok.  On centos machine the script produced "Segmentation fault'. The matlab script sensemcass.m now calculates the position on the MC mirrors in mm. The attached table shows the MC spot positions in mm:

    feb 26 2011      may 08 2011
MC1 pit   1.6   1.9
MC2 pit   6.4   9.0
MC3 pit   1.4   2.0
MC1 yaw   -1.5   -1.7
MC2 yaw   1.0   0.2
MC3 yaw   -1.3   -1.9

I had to rephase the lockin digital phases by tens of degrees. I don't know why this should happen at ~10 Hz.

 