40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log  Not logged in ELOG logo
Entry  Tue May 3 05:32:04 2011, kiwamu, Update, LSC, daytime tasks 
    Reply  Tue May 3 10:21:25 2011, Koji, Update, LSC, daytime tasks 
    Reply  Tue May 3 11:49:03 2011, Koji, Update, LSC, daytime tasks 
Message ID: 4607     Entry time: Tue May 3 10:21:25 2011     In reply to: 4606
Author: Koji 
Type: Update 
Category: LSC 
Subject: daytime tasks 

I think the installation of the PD DC signals are quite important. What to do
1) Connect the DC signals to the right top whitening board (be aware that there may be the modification of the whitening circuit).
2) Reconfigure the LSC model such that the DC signal is passed to the right channels (modify the left top part of the model)

Quote:

Daytime tasks :

 - PRM & BS oplev (Steve)

 - LSC binary outputs (Joe/Jamie)

 - installation of the REFL55 RFPD (Suresh/Jamie)

 - Adjustment of demodulation phases (Kiwamu)

 - Bounce-Roll filters on BS and PRM (Suresh/Joe)

 - Suspension diagnostic using the free-swinging spectra (Leo)

 - PMC alignment (Jenne/Koji)

 

ELOG V3.1.3-