Entry  Mon May 2 12:51:52 2011, kiwamu, Update, LSC, PRMI locking : plan 
    Reply  Mon May 2 13:30:13 2011, kiwamu, Update, SUS, PRMI locking prep: PRM oplev 
    Reply  Mon May 2 18:16:24 2011, kiwamu, Update, LSC, PRMI locking : status update 
    Reply  Tue May 3 03:53:20 2011, kiwamu, Update, LSC, PRMI locking : done PRMI_locking.png
       Reply  Tue May 3 16:47:55 2011, kiwamu, Update, LSC, PRMI locking : details APtable.png
Message ID: 4600     Entry time: Mon May 2 18:16:24 2011     In reply to: 4595
Author: kiwamu 
Type: Update 
Category: LSC 
Subject: PRMI locking : status update 

(done)

- AS55 RFPD

  With a help from Jamie the AS55 RFPD was installed.

- 55 MHz demodulation board

  The AS55 demod board was installed on 1Y2.

- 3-way combiner

  ZFSC-3-13 has been installed. All the RF cables from the source side were connected to the combiner.

 

(next things)

 - installation of the REFL11 RFPD

 - DAQ check for AS55 and REFL11

Quote from #4595

(to be done in the daytime)

 - setup AS55 RFPD

 - install a demod board for 55 MHz

 - install a 3-way RF combiner on EOM.

 - prepare 55 MHz RF source (Marconi or RF source box ?)

 