40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log  Not logged in ELOG logo
Entry  Thu Apr 28 06:46:30 2011, Suresh, Update, RF System, RF Source installed P4280064.JPG
    Reply  Thu Apr 28 15:31:36 2011, kiwamu, Update, IOO, MC PDH lock : readjustment of demodulation phase DSC_2975_ss.jpg
Message ID: 4578     Entry time: Thu Apr 28 06:46:30 2011     Reply to this: 4582
Author: Suresh 
Type: Update 
Category: RF System 
Subject: RF Source installed 

RF Source box has been mounted in the 1X2 rack. 

P4280064.JPG

 

Heliax cables have been directly attached to the box and anchored on the side of the 1X2 rack.  Here is a list of Helix cables which have been connected so far.

 

Cables old name New name From -> To
1 133 MHz 11 Mhz Demod 1X2 to 1Y2 rack
2 199 MHz 55 MHz Demod 1X2 to 1Y2 rack
3 166 EOM 11 MHz EOM 1X2 to PSL table
4 33 EOM 55 MHz EOM 1X2 to PSL table
5 REFL 33 AS11 AS table to 1Y2

 

ELOG V3.1.3-