Message ID: 4567     Entry time: Mon Apr 25 22:38:49 2011
Author: kiwamu 
Type: Update 
Category: LSC 
Subject: prepration for DRMI : Y arm flashing 
This week is going to be a recycled Michelson week.
As a preparation I did several things today :
 1. Alignment of the Y arm
 2. Alignment of PRM
 3. Checking of all the pick-off ports

 


 
(Y arm alignment)
 The idea to have the Y arm aligned is that : once we lock the Y arm we will be able to align the input PZTs using the Y arm as a reference.
 I tried aligning the Y arm and successfully made the Y arm flashing with IR. I can see it flashing on ITMY camera but no flashing on ETMY camera.
 
(PRM alignment)
PRM has been intentionally misaligned for the single arm green locking test.
I just confirmed that we can bring PRM back to a good alignment. Now we can see the central part is flashing too.
 
(picked-off beams)
I went checking through all the picked off beams to see if they are available or not.
POX : lost
POY : fine
POP : very clipped
POSRM : fine