Target: To lock the Michelson with the new RF/LSC
Status
RF generation box: READY - already ready to go to the IOO rack. (Suresh)
RF distribution box: In Progress - the internal components are to be connected. (13th evening - Suresh)
Placing PD and CCD: Done - PD and CCD on the AP table (13th Afternoon - Aidan, Larisa with supervision of Kiwamu)
Cabling1: Done - PD signal AP table to the demodulator (13th Afternoon - Jamie with supervision of Suresh)
Cabling2: Done - RF generation box (IOO Rack) to the demodulator
Demodulator: In Progress - Test and install (13th night - Kiwamu with supervision of Suresh)
LSC model: Done - Run the new LSC model. (It is named as "C1LST" so far) (13th evening - Jamie)