40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log  Not logged in ELOG logo
Message ID: 4458     Entry time: Tue Mar 29 22:29:16 2011
Author: kiwamu 
Type: Update 
Category: General 
Subject: some tasks tomorrow 

 *  Temporary strain relief for the heliax cables on 1X2 (Steve)

 *  RF diagrams and check lists (Suresh)

      => In the lunch meeting we will discuss the details about what we will do for the RF installation.

 *  Electronics design and plan for Green locking (Aidan / Kiwamu)

      => In the lunch meeting we will discuss the details.

 *  LSC model (Koji)

 *  Video cable session (team)

 * LPF for the laser temperature control (Larisa)

ELOG V3.1.3-