40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log  Not logged in ELOG logo
Message ID: 443     Entry time: Thu Apr 24 15:57:53 2008
Author: steve 
Type: Configuration 
Category: SAFETY 
Subject: Safety at AP-ISCT 
I measured the output power of the psl after the mechanical shutter.

It was 1.1 W with Ophir power meter, than unlocked the MC and measured
the power at the MC-REFL Beam Dump at the AP-ISCT 0.9 W
Power on MC-REFL photodiode 92 mW

High power metal beam shields were installed around the beam path of
MC-REFL between AP-Viewport and MC-REFL Beam Dump.
Placed HIGH POWER LASER BEAM PATH warning signs on table frame and top
covers.

Last week I placed a small monitor on the top of the OOC that
monitors the resonant spot of MC2. Please keep an eye on this monitor
when working on the AP-ISCT

AP table should NOT be left uncovered. One experienced laser operator
has to be present if the top is removed and IR-viewer scan required.
We need your full cooperation to keep this lab safe.
Attachment 1: P1020197.JPG  1.573 MB  | Hide | Hide all
P1020197.JPG
Attachment 2: mcrefl3.JPG  1.501 MB  | Hide | Hide all
mcrefl3.JPG
ELOG V3.1.3-