40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log  Not logged in ELOG logo
Entry  Mon Mar 21 16:49:11 2011, kiwamu, Summary, Green Locking, plan for this week 
    Reply  Tue Mar 22 00:01:25 2011, kiwamu, Summary, Green Locking, plan for daytime tasks 
Message ID: 4421     Entry time: Tue Mar 22 00:01:25 2011     In reply to: 4419
Author: kiwamu 
Type: Summary 
Category: Green Locking 
Subject: plan for daytime tasks 

Some tasks for the daytime tomorrow.

  * Beam profile measurements of the Y end laser  (Suresh / Bryan)

  * Taking care of CDS and the simulated plant (Jamie / Joe)

  * Reconnect the X end mechanical shutter to 1X9 (Kiwamu)

  * LPF for the X end temperature feedback (Larisa)

ELOG V3.1.3-