- Plan for this week
* Intensity stabilization for the end green laser (Matt / Kiwamu)
* Hand off the servo from Green to Red (Matt / Kiwamu)
* Y end green locking (Suresh / Bryan) (rough schedule)
* Reconnect the X end mechanical shutter to 1X9 (Kiwamu)
* Connect the end DCPD signal to a DAC (done)
* Make a LPF in a Pomona box for the temperature (Larisa)
* Clean up and finalize the X end setup (Kiwamu)
* Make a item lists for electronics. Order the electronics. (Aidan / Kiwamu) |