Entry  Fri Feb 25 13:28:14 2011, kiwamu, Summary, General, to do list 
    Reply  Fri Feb 25 14:50:16 2011, Koji, Summary, General, to do list 
       Reply  Mon Feb 28 11:22:40 2011, josephb, Summary, General, to do list 
Message ID: 4364     Entry time: Mon Feb 28 11:22:40 2011     In reply to: 4359
Author: josephb 
Type: Summary 
Category: General 
Subject: to do list 
Quote:

- Where is the CDS TO DO ==> Joe

CDS To Do:

1) Get ETMY working - figure out why signals are not getting past the AI board (D000186) to the coils.

2) Get TDS and command line AWG stuff working

3) Get c1ass and new c1lsc (with Koji) fully integrated with the rest of the system.

4) Get CDS software instructions up to date and well organized.

5) Redo cabling  and generally make it a permanent installation instead of hack job:

   a) Measure cable lengths, check connectors, wire with good routes and ensure strain relief.  Ensure proper labeling

   b) Get correct length fiber for c1sus RFM and timing.

   c) Fix up final BO adapter box and DAC boxes.

   d) Make boxes for the AA filter adapters which are currently just hanging.

   e) Get two "faceplates" for the cards in the back of the ETMY IO chassis so they can screwed down properly.

   f) Remove and properly store old, unused cables, boards, and anything else.

6) Create new documentation detailing the current 40m setup, both DCC documents and interactive wiki.

7)  Setup an Ubuntu work station using Keith's wiki instructions

 

Simulated Plant To Do:

1)Create simulated plant to interface with current end mass controls (say scx).

2) Create proper filters for pendulum and noise generation, test suspension.

3) Propagate to all other suspensions.

4) Working on simulated IFO plant to connect to LSC.  Create filters for near locked (assume initial green control perhaps) state.

5) Test LSC controls on simulated IFO.

6) Fix c code so there's seamless switching between simulated and real controls.

CDS Status: