40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log  Not logged in ELOG logo
Message ID: 4330     Entry time: Sat Feb 19 05:25:20 2011
Author: Suresh 
Type: Update 
Category: Electronics 
Subject: RF: Distribution box 

Most of the RF cables required for the box are done.   There are two remaining and we will attend to these tonight. 

We expect to have finished the mechanical assembly by Sunday and start a quality test on Monday.

 

 

ELOG V3.1.3-