40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log  Not logged in ELOG logo
Entry  Thu Feb 17 23:56:53 2011, josephb, Update, CDS, Daqd was rebuilt, now reverted. 
    Reply  Fri Feb 18 00:13:55 2011, kiwamu, Update, CDS, Re:Daqd was rebuilt, now reverted. 
Message ID: 4320     Entry time: Thu Feb 17 23:56:53 2011     Reply to this: 4321
Author: josephb 
Type: Update 
Category: CDS 
Subject: Daqd was rebuilt, now reverted. 

As one of the trouble shooting steps for the daqd (i.e. framebuilder) I rebuilt the daqd executable.  My guess is somewhere in the build code is some kind of GPS offset to make the time correct due to our lack of IRIG-B signal.

The actual daqdrc file was left untouched when I did the new install, so the symmetricom gps offset is still the same, which confuses me.

I'll take a look at the SVN diffs tomorrow to see what changed in that code that could cause a 300000000 or so offset to the GPS time.

 

 

ELOG V3.1.3-