Mon Dec 20 10:47:29 2010, Koji, Update, IOO, Plan for closing the vacuum chambers
|
Mon Dec 20 16:57:58 2010, steve, Update, IOO, checking out & closing the vacuum chambers
|
Mon Dec 20 23:32:58 2010, kiwamu, Update, IOO, Re:checking out & closing the vacuum chambers
|
Mon Dec 20 22:56:20 2010, Jenne, Update, IOO, Plan for closing the vacuum chambers
|
|
Message ID: 4078
Entry time: Mon Dec 20 22:56:20 2010
In reply to: 4076
|
Author: |
Jenne |
Type: |
Update |
Category: |
IOO |
Subject: |
Plan for closing the vacuum chambers |
|
|
Tuesday
- If still everythig is fine, put the BS heavy door.
- Do the following list for all of the testmass chambers.
- Check if the OSEMs and the OPLEV are still fine. (ITMX and ITMY were not done on Monday, so need extra care.)
- Inspect the surface of the mirror with a laser pointer or a fiber coupled halogen light.
- Blow the mirrors by the ionization gun.
- Inspect the mirror surface again.
- Move the suspension tower close to the door.
- Make a single drag-wipe with iso
- Move the SOS tower at the original place.
- Check the OSEMs and the OPLEVs. Adjust the alignment.
- Put the heavy door.
- Start slow pumping |