40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log  Not logged in ELOG logo
Message ID: 4030     Entry time: Wed Dec 8 22:35:50 2010
Author: kiwamu 
Type: Update 
Category: SUS 
Subject: oplev installed on ITMX and ETMX 

The oplevs have been installed on ITMX and ETMX.

Now the oplev servos are running.

The lock of the green beam became more stable after the oplevs were activated.

 


(what I did)

- opened the ITMX and ETMX chamber.

- rearranged the oplev mirrors in the vacuum chambers so that we can have the reflected oplev beam coming out from the viewport.

    At the ITMX table, I put the oplev mirrors approximately on the designed places.

- aligned the beam on the optical benches

- strung a ribbon cable at the 1X9 rack.

   This cable connects the oplev interface board and the ADC blue golden board.

- modified c1scx simulink model.

  Since the model didn't have proper connections to the ADC channels, I added four ADC channels and plugged them into oplev servo in the model.

- relaunched the c1scx code after building and installing it.

- activated the oplev servos. Amazingly the default gains did work (i.e. all the gain = 1)

- after aligning X arm to the green beam, I did final centering of oplev beams

 

(details)

 - - - - - ADC connection for ETMX oplev signals :

ADC0_24 = segment_1

ADC0_25 = segment_2

ADC0_26 = segment_3

ADC0_27 = segment_4

ELOG V3.1.3-