40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log  Not logged in ELOG logo
Entry  Tue Nov 23 10:48:31 2010, Koji, Update, IOO, the plan of the day 
    Reply  Tue Nov 23 22:01:49 2010, kiwamu, Update, IOO, immigration plan for in-vac PZT mirrors  Untitled.png
       Reply  Mon Nov 29 11:51:41 2010, kiwamu, Update, IOO, swaped in-vac PZT mirrors  
          Reply  Tue Nov 30 04:22:52 2010, kiwamu, Update, IOO, swaped in-vac PZT mirrors  
             Reply  Tue Nov 30 12:33:27 2010, kiwamu, Summary, IOO, cabling of in-vac PZT mirrors  
Message ID: 3992     Entry time: Tue Nov 30 04:22:52 2010     In reply to: 3988     Reply to this: 3996
Author: kiwamu 
Type: Update 
Category: IOO 
Subject: swaped in-vac PZT mirrors  

As a result of the vacuum work, now the IR beam is hitting ETMX.

The spot of the transmitted beam from the cavity can be found at the end table by using an IR viewer.

Quote: #3988

(today's missions for IOO)

 - cabling for the pzt mirrors

 - energizing the pzt mirrors and slide them to their midpoint.

 - locking and alignment of the MC

 - realignment of the pzt mirrors and other optics.

 - letting the beam go down to the arm cavity

 

 

ELOG V3.1.3-