Message ID: 3797     Entry time: Wed Oct 27 15:38:19 2010
Author: josephb, yuta 
Type: Update 
Category: CDS 
Subject: IO chassis with bad timing was taken back to Downs 

Problem:

The front end timing was not working properly for 2 of the IO chassis.  They were not being synced to the 1 PPS signal. 

This prevented the use of RFM for communication between front ends because time stamps on the transmitted data did not match the cycle on the receiving machine.

Action:

We took one of the incorrectly working chassis over to Downs.  Rolf said he would take a look at it tomorrow morning.

Joe will be going over tomorrow morning to talk with Rolf and see what needs to be done to fix it.

 