40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log  Not logged in ELOG logo
Message ID: 3642     Entry time: Mon Oct 4 11:20:45 2010
Author: josephb 
Type: Update 
Category: CDS 
Subject: Fixed Suspension binary output list and sus model 

I've updated the CDS wiki page listing the wiring of the 40m suspensions with the correct binary output channels.  I previously had confused the wiring of the Auxillary crate XY220 (watchdogs) with the SOS coil dewhitening bypasses.  So I had wound up with the wrong channels (the physical cables we plugged in were correct, just what I thought was going on channel X of that cable was wrong).  This has been corrected in the plan now.  The updated channel/cable list is at http://lhocds.ligo-wa.caltech.edu:8000/40m/Upgrade_09/CDS/Suspension_wiring_to_channels

ELOG V3.1.3-