40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log  Not logged in ELOG logo
Message ID: 3593     Entry time: Tue Sep 21 16:05:21 2010
Author: josephb 
Type: Update 
Category: CDS 
Subject: First pass at rack diagram 

I've made a first pass at a rack diagram for the 1X1 and 1X2 racks, attached as png.

Gray is old existing boards, power supplies etc.  Blue is new CDS computers and IO chassis, and gold is for the Alberto's new RF electronics.  I still need to double check on whether some of these boards will be coming out (perhaps the 2U FSS ref board?).

Attachment 1: 1X1_1X2_racks.png  149 kB  | Hide | Hide all
1X1_1X2_racks.png
ELOG V3.1.3-