Message ID: 3590     Entry time: Mon Sep 20 16:59:26 2010
Author: josephb 
Type: Update 
Category: CDS 
Subject: Megatron in 1X2 rack, to be come c1ioo 

[Rana, Koji, Joe]

We pulled the phase shifters in the 1X2 rack out to make room for megatron.  Megatron will be converted into c1ioo, and the 8 core, 1U computer will be used as c1lsc.  A temporary ethernet cable was run from 1X2 to 1X3 to connect megatron to the same sub-network.

The c1lsc machine was worked on today, setting it up to run the real time code, along with the correct controls accounts, passwords, .cshrc files, etc.  It needs to be moved from 1X1 to 1X4 tomorrow.