Message ID: 3582     Entry time: Fri Sep 17 03:32:11 2010
Author: Koji 
Type: Update 
Category: SUS 
Subject: Arrangement of the SUS towers 

The day before yesterday, I was cleaning a flow bench in the clean room.

I found that one SOS was standing there. It is the SRM suspension.

I thought of the nice idea:

- The installed PRM is actually the SRM (SRMU04). It is 2nd best SRM but not so diiferent form the best one.
==> Use this as the final SRM

- The SRM tower at the clean room
==> Use this as the final PRM tower.
==> The mirror (SRMU03) will be stored in a cabinet.

- The two SOS towers will be baked soon
==> Use them for the ETMs

This reduces the unnecessary maneuver of the suspension towers.