40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log  Not logged in ELOG logo
Message ID: 3569     Entry time: Mon Sep 13 21:52:53 2010
Author: kiwamu 
Type: Update 
Category: Green Locking 
Subject: the X end laser is ON 

 I turned ON the laser at the X end station, which had been OFF for several weeks because of the crane business.

Now the green beam hits the ITMX and I got a reflection back to the end table.   

This green beam will be a nice reference when we install the green periscope in the chamber.

If it's necessary, feel free to correct the alignment of the green beam during my absence.

ELOG V3.1.3-