40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log  Not logged in ELOG logo
Message ID: 3553     Entry time: Thu Sep 9 14:42:40 2010
Author: josephb 
Type: Update 
Category: CDS 
Subject: Updating suspensions model 

I've been working on updating the suspensions model, incorporating Koji's refinements as well as trying to simplify the model and making it less cluttered. 

This had the side benefit of making an incorrect connection obvious.  I had incorrectly wired the ASCPIT input to be summed into the yaw path, and the ASCYAW input into the pitch path.  This has been corrected.

I've finished a single optic, and now I am in the process of propagating the changes to all the optics, as well as cleaning up the overall diagram using Rolf's new tags, which make things much less cluttered.  I've attached a screenshot of the PRM optic control model, and will be updating the Matlab web export once I've updated the full model.

Attachment 1: SingleSUS.png  130 kB  | Hide | Hide all
SingleSUS.png
ELOG V3.1.3-