40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log  Not logged in ELOG logo
Entry  Wed Sep 8 00:01:07 2010, rana, valera, Update, PSL, PMC update 
    Reply  Wed Sep 8 09:50:13 2010, rana, Update, PSL, PSL update 
       Reply  Wed Sep 8 11:46:53 2010, kiwamu, Update, PSL, update of the layout 40mPSL.png
Message ID: 3543     Entry time: Wed Sep 8 09:50:13 2010     In reply to: 3542     Reply to this: 3544
Author: rana 
Type: Update 
Category: PSL 
Subject: PSL update 

Also, Kiwamu has modified the layout drawing to add the green PLL stuff. This has collapsed the reference cavity's wave function placing it close to its original position.

WE (maybe Valera and Steve) can now put the reference cavity back on the table.

ELOG V3.1.3-