40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log  Not logged in ELOG logo
Entry  Tue Aug 24 12:03:57 2010, rana, Update, PSL, PSL Upgrade: Mode Matching from PMC to IMC 40mPSL.pngScreen_shot_2010-08-24_at_6.07.43_PM.png
    Reply  Wed Aug 25 15:32:52 2010, rana, Update, PSL, PSL Upgrade: Mode Matching from PMC to IMC 40mPSL.pngScreen_shot_2010-08-25_at_6.26.23_PM.png
       Reply  Wed Aug 25 15:42:01 2010, Jenne, Update, PSL, PSL Upgrade: Mode Matching from PMC to IMC 
Message ID: 3470     Entry time: Wed Aug 25 15:42:01 2010     In reply to: 3469
Author: Jenne 
Type: Update 
Category: PSL 
Subject: PSL Upgrade: Mode Matching from PMC to IMC 

Thoughts on where to take the pickoff for the SHG for the PSL-green?  We discussed today at the meeting the possibility of putting a 90/10 beam splitter right after the PMC, so that the green team would get somewhere between 100-200mW. 

Quote:

40mPSL.png

 

 

ELOG V3.1.3-