The preparation for pouring concrete is continuing. The grout forms were removed. Half inch ribbed steel bars were epoxied into our 4" thick floor.
The concrete holding sides- forms are cut to size. They will be installed on Monday morning and pouring concrete should follow.
We can be planning for cleaning up on Tuesday
Atm1, epoxy used bars
Atm2, south west tripod feet grouted
Atm3, ribbed bars are getting ready |