Subject: grouting is done 

The preparation for pouring concrete is continuing. The grout forms were removed. Half inch ribbed steel bars were epoxied into our 4" thick floor.

The concrete holding sides- forms are cut to size. They will be installed on Monday morning and pouring concrete should follow.

We can be planning for cleaning up on Tuesday

 

Atm1, epoxy used bars

Atm2, south west tripod feet grouted

Atm3, ribbed bars are getting ready