Work on Aug 9th
Steve, Jenne, Koji, Alberto, Aidan, Jan, Sharmila, Katherine
From 9am to 6pm
- Shutting down the PSL after the 90885 hours of service
- Removals
- The accelerometers
- The reference cavity chamber
- The periscopes were left so far
- The cables between the PSL table and the outside have been disconnected
- Listed items on Friday
- Some unlisted items recorded and disconnected
- Drained the cooling water from the chiller lines
- Pulled out the chiller connections at the control room as well as the chiller control cables (temp sens & RS232C)
- Sealed the PSL table with plastic sheets
- Put antistatic films to the table (they are supported by the long optical poles)
- Used capton tapes to fix the films on to the table
- Put the white huge plastic sheet to cover the table at once
- Some spaces at the edge of the tables are left flat such that the C-clamps can be attached
- Sealed the AP and the ITMY tables by capton tapes