Entry  Thu Aug 5 00:17:41 2010, Koji, Update, PSL, PSL preparation work 
    Reply  Thu Aug 5 22:36:11 2010, Koji, Update, PSL, PSL preparation work 
       Reply  Fri Aug 6 08:09:15 2010, steve, Update, PSL, PSL preparation work 
       Reply  Fri Aug 6 20:00:03 2010, Koji, Update, PSL, PSL preparation work PSL_cable_map.pdf
Message ID: 3381     Entry time: Fri Aug 6 20:00:03 2010     In reply to: 3370
Author: Koji 
Type: Update 
Category: PSL 
Subject: PSL preparation work 

PSL preparation work report

Aug 6th 10am-5pm: (Steve, Jenne, Alberto, Kiwamu, Koji)

- We labeled the cables to be disconnected

  • These will be disconnected in order to isolate the PSL table and the frame (housing) from the other part of the lab.
  • Upon the labeling we made the list and the map of the cables to be removed.
  • On Monday we disconnect those cables one by one accoding to the list.

- The following stuffs have been removed from the PSL table

  • The big nuts at the side of the PSL table
  • The cable ties on the PSL frame
  • Innolight 2W
  • The green pickoff optics at the edge
  • The optics on the shelf
  • The oscilloscopes on the shelf

- The OMC power supply cable was visited.

  • The connections to the power supply were removed. There are two HV outputs.

- We put thick and long optical poles

  • They are placed at the edge of the table so that we can put the plastic sheets on the table without touching the optics.

Plan on Monday

Aug 9th  9am-5pm: (Steve, Jenne, Alberto, Koji)

  • Disconnecting the cables ==> All
  • Shutting down the PSL ==> Steve/Koji
    • Draining the cooling water  ==> Steve
  • Removals
    • The accelerometers ==> Jenne
    • The reference cavity chamber ==> Steve
    • The small periscope ==> Alberto
  • Sealing of the table with the plastic sheets
  • The chiller is planned to go to MIT 

 