Thu Aug 5 00:17:41 2010, Koji, Update, PSL, PSL preparation work
|
Thu Aug 5 22:36:11 2010, Koji, Update, PSL, PSL preparation work
|
Fri Aug 6 08:09:15 2010, steve, Update, PSL, PSL preparation work
|
Fri Aug 6 20:00:03 2010, Koji, Update, PSL, PSL preparation work
|
|
Message ID: 3381
Entry time: Fri Aug 6 20:00:03 2010
In reply to: 3370
|
Author: |
Koji |
Type: |
Update |
Category: |
PSL |
Subject: |
PSL preparation work |
|
|
PSL preparation work report
Aug 6th 10am-5pm: (Steve, Jenne, Alberto, Kiwamu, Koji)
- We labeled the cables to be disconnected
- These will be disconnected in order to isolate the PSL table and the frame (housing) from the other part of the lab.
- Upon the labeling we made the list and the map of the cables to be removed.
- On Monday we disconnect those cables one by one accoding to the list.
- The following stuffs have been removed from the PSL table
- The big nuts at the side of the PSL table
- The cable ties on the PSL frame
- Innolight 2W
- The green pickoff optics at the edge
- The optics on the shelf
- The oscilloscopes on the shelf
- The OMC power supply cable was visited.
- The connections to the power supply were removed. There are two HV outputs.
- We put thick and long optical poles
- They are placed at the edge of the table so that we can put the plastic sheets on the table without touching the optics.
Plan on Monday
Aug 9th 9am-5pm: (Steve, Jenne, Alberto, Koji)
- Disconnecting the cables ==> All
- Shutting down the PSL ==> Steve/Koji
- Draining the cooling water ==> Steve
- Removals
- The accelerometers ==> Jenne
- The reference cavity chamber ==> Steve
- The small periscope ==> Alberto
- Sealing of the table with the plastic sheets
- The chiller is planned to go to MIT
|
|
|