40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log  Not logged in ELOG logo
Entry  Tue Jul 20 08:04:31 2010, steve, Configuration, VAC, slow vent has started 
    Reply  Tue Jul 20 23:52:36 2010, kiwamu, Update, VAC, update: slow vent has started untitled.png
       Reply  Wed Jul 21 12:41:31 2010, kiwamu, Update, VAC, vent finished 
          Reply  Thu Jul 22 08:07:27 2010, steve, Update, VAC, vent finished 30hvent.jpg
Message ID: 3248     Entry time: Tue Jul 20 08:04:31 2010     Reply to this: 3254
Author: steve 
Type: Configuration 
Category: VAC 
Subject: slow vent has started 

The PSL shutter was closed. The beam path  blocked two places. High voltage power supplies to IOO and OMC PZT were checked to be off. Oplevs are off. 

The south arm green cavity was misaligned yesterday

We would like to keep the vent speed at 1 torr / min. I'm venting with N2 now up to 25 PSI. We have 3 cylinder  of instrument grade air inside the lab. Additional supply will arrive later. It can be as late as 1pm