40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log  Not logged in ELOG logo
Message ID: 3102     Entry time: Wed Jun 23 12:28:34 2010
Author: Razib 
Type: Summary 
Category: Phase Camera 
Subject: Weeekly Summary 

This past week I have completed the following tasks:

 

1. Built a trigger and power box for the camera GC 750M (06058) and took some test images to see whether the trigger box really works. Result: It is doing fine!

2. Went over the setup that is already sitting on the table. Ref: Aidan's elog entry

3. Attended seminars and talks given by Alan, Jahms, Koji and Rana.

4. Attended the mandatory laser safety training by Peter.

 

Expected task for this week (could be more):

1. Work out analytical expressions of the power of the carrier and sidebands going to the camera in the setup. (As suggested by Rana and Joe)

2. Work on producing beat signal to the camera using the He-Ne laser setup.

3. Move,if possible, to the Nd:YAG setup.

4. Go over the codes and paper by the past SURFers on the phase camera experiment.

 

trigger-box_circuit.png

 


 

Attachment 2: test1.png  140 kB  | Show | Show all
ELOG V3.1.3-