A progress on the end PDH locking :
by using a modified PDH box the green laser on the X-end station is locked to the arm cavity.
So far the end PDH locking had been achieved by using SR560s, but it was not sophisticated filter.
To have a sophisticated filter and make the control loop more stable, the PDH box labeled "#G1" was installed instead of the SR560s.
After the installation the loop looks more stable than the before.
Some details about the modification of the PDH box will be posted later.
Although, sometimes the loop was unlocked because the sum-amp (still SR560) which mixes the modulation and the feedback signal going to the NPRO PZT was saturated sometimes.
Thus as we expected a temperature control for the laser crystal is definitely needed in order to reduce such big low frequency drive signal to the PZT. |