40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log  Not logged in ELOG logo
Entry  Wed Jun 2 18:09:32 2010, steve, Update, PEM, seismometers off of linoleum floor 
    Reply  Wed Jun 2 21:21:43 2010, steve, Update, PEM, seismometers off of linoleum floor 
       Reply  Thu Jun 3 22:17:05 2010, rana, Update, PEM, seismometers off of linoleum floor Untitled.pnga.pngUntitled.png
          Reply  Fri Jun 4 23:52:57 2010, rana, Update, PEM, seismometers off of linoleum floor Untitled.pnghuddlez.png
Message ID: 3039     Entry time: Wed Jun 2 21:21:43 2010     In reply to: 3037     Reply to this: 3047
Author: steve 
Type: Update 
Category: PEM 
Subject: seismometers off of linoleum floor 

Quote:

Steve for Nancy,

Seismometer interface box ac power was turned off, Guralps disconnected and moved. Ranger locked, moved and released. Nancy will describe the rest soon.

The flattened lead balls were checked for their heights by the calliper, and were all in the range of 9.50 to 9.70 mm.

The rechecking was done by using these balls between two aluminium plates and checking their levelling. When confirmed this, we proceeded to install the balls(no more balls :P ) in their place.

The Guralps were switched off by switching off the power supply to them. The ranger mass was clamped in order to be able to move it. This can be undone by rotating the transport screw counter-clockwise.

We installed the flattened lead ballsin the space made for them. The granite was then placed on it with the help of many other people in the lab.  It was lowered by hanging it on two straps held by people , and then placed in the space marked for it.

Did we then turn on the seismometers? Did we release the locking screw on the Ranger? What happened to Bat-Boy??? Since they make a good mystery I will choose to leave them out of my elog entry.