40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log  Not logged in ELOG logo
Entry  Fri May 28 13:32:01 2010, alberto, kiwamu, Update, VAC, vacuum work 
    Reply  Fri May 28 13:51:51 2010, Jenne, Update, VAC, vacuum work 
       Reply  Fri May 28 14:24:30 2010, Jenne, Update, VAC, vacuum work 
Message ID: 3011     Entry time: Fri May 28 14:24:30 2010     In reply to: 3010
Author: Jenne 
Type: Update 
Category: VAC 
Subject: vacuum work 

I just got off the phone with Alberto and Kiwamu, and I'm going to try to recalculate things based on their measurements of the distances between MC3 and SM1.  It sounds like the CAD drawings we have aren't totally correct.    I know that when we opened doors just before Christmas we measured the distances between the BS table and the ITM tables, but I don't think we measured the distance between the IOO table and the BS table.  Hopefully we can fit everything in our chambers.....

ELOG V3.1.3-