Wed Nov 11 12:50:10 2009, Jenne, Update, PEM, Seismometer Noise Characteristics
|
Thu Apr 22 20:28:40 2010, Jenne, Update, PEM, Seismometer Noise Characteristics
|
Thu May 27 23:59:54 2010, rana, Update, PEM, New Foam Box installed
|
Fri May 28 00:40:53 2010, rana, Update, PEM, DAQ down
|
Fri May 28 10:44:47 2010, josephb, Update, PEM, DAQ down
|
Tue Jun 8 18:39:36 2010, rana, Update, PEM, DAQ down
|
Tue Jun 8 20:52:25 2010, josephb, Update, PEM, DAQ up (for the moment)
|
Fri May 28 11:26:35 2010, Jenne, Update, PEM, New Foam Box installed
|
Tue Jun 1 11:47:14 2010, steve, Update, PEM, lead balls on concrete
|
Wed Jun 9 19:47:08 2010, nancy, Update, PEM, lead balls on concrete
|
Thu Jun 10 07:53:14 2010, Alberto, Update, PEM, LaTeXlabs
|
Thu Jun 10 10:58:02 2010, Koji, Update, General, LaTeXlabs
|
Thu Jun 10 11:10:21 2010, Alberto, Update, General, LaTeXlabs
|
|
Message ID: 3002
Entry time: Thu May 27 23:59:54 2010
In reply to: 2833
Reply to this: 3003
3006
3024
|
Author: |
rana |
Type: |
Update |
Category: |
PEM |
Subject: |
New Foam Box installed |
|
|
Valera and I put the 2 Guralps and the Ranger onto the big granite slab and then put the new big yellow foam box on top of it.
There is a problem with the setup. I believe that the lead balls under the slab are not sitting right. We need to cut out the tile so the thing sits directly on some steel inserts.
You can see from the dataviewer trend that the horizontal directions got a lot noisier as soon as we put the things on the slab. |
|
|