40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log  Not logged in ELOG logo
Message ID: 2958     Entry time: Thu May 20 13:12:28 2010
Author: josephb 
Type: Update 
Category: CDS 
Subject: Preparations for testing lsc,lsp, scy,spy together 

In /cvs/cds/caltech/target/fb modified:

master: cleaned up so only io1 (IO processor), LSC, LSP, SCY, SPY were listed, along with their associated tpchan files.

daqdrc: fixed "dcu_rate 9 = 32768" to "dcu_rate 9 = 65536" (since the IO processor is running at 64k)

Added "dcu_rate 21 = 16384" and "dcu_rate 22 = 16384"

Changed "set gds_server = "megatron" "megatron" "megatron" 9 "megatron" 10 "megatron" 11;" to

set gds_server = "megatron" "megatron" 9 9;

The above change was made after reading Rolf's Admin guide: http://lhocds.ligo-wa.caltech.edu:8000/40m/Upgrade_09/CDS?action=AttachFile&do=get&target=RCG_admin_guide.pdf
The set gds_server is simply telling which computer the gds daemons are running on, and we don't need to do it 5 times.


In /cvs/cds/caltech/gds/params modified:

testpoint.par: added C-node7 and C-node8 for SCY and SPY respectively.

ELOG V3.1.3-