40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log  Not logged in ELOG logo
Message ID: 2923     Entry time: Wed May 12 12:58:26 2010
Author: josephb 
Type: Configuration 
Category: CDS 
Subject: Setup fb to handle lsc, lsp models on megatron 

I modified /cvs/cds/caltech/target/fb and changed the line "set controller_dcu=10" to "set controller_dcu=13" (where 13 is the lsc dcu_id number).

I also changed the set gds_server line from having 10 and 11 to 13 and 14 (lsc and lsp).

The file /cvs/cds/caltech/fb/master was modified to use C1LSC.ini and C1LSP.ini, as well as tpchn_C2.par (LSC) and tpchn_C3.par (LSP)

testpoint.par in /cvs/cds/caltech/target/gds/param was modified to use C-node1 and C-node2 (1 less then the gds_node_id for lsc and lsp respectively).

Note all the values of gds_node_id, dcu_id, and so forth are recorded at http://lhocds.ligo-wa.caltech.edu:8000/40m/Electronics/Existing_RCG_DCUID_and_gds_ids

ELOG V3.1.3-